The Architect has designed the FLOOR PLAN WITH following measures for the new IT building at
Aljunied Central.
a. There is 2.4 m perimeter welded mesh fence line with a vehicular
(steel) sliding gate and staff entrance (full height turnstile) of the same
height are provided at the facility.
DSWSH MC3 - SP&D 3
b. The main vehicular sliding gate and full height turnstile are facing the
main road, 3 storey building located both sides of the new IT building
and dense vegetation at the back of building.
c. The building is designed with fixed glass façade.
d. There is one main glass door entrance into the building and 2 fire
escape staircases proposed with wooden doors.
e. A guard house is proposed next to the main vehicular sliding gate.
f. The Visitor management system is proposed at the IT Building
Reception Counter.
g. The office blocks on both sides are located 3m away from the new IT
building fence line.
h. The space allocation for the new main office building is as follow:
i. 1st Storey – Main Lobby, Lift (2 nos) lobby, Reception Counter,
Security Control Room, Mail room, Mechanical & Electrical
(M&E) and Generator rooms. 2 speed gates are proposed at the
Main lobby providing access to Lift lobby.
ii. 2ndStorey – Meeting rooms (3 no), Administrative Department
(office area), consisting of Mail Sorting room and Confidential
Document Storage room.
iii. 3rdStorey – HR Department (office area), consisting of
Document Compactus Room. 2 Server rooms consisting of
racks (4 no) openable front and back and a LAN room.
iv. 4thStorey – Senior Management Offices, Board and Function
rooms.
v. Mechanical & Electrical and Security rises are located at every
floor.
vi. Wooden doors are proposed for all rooms at all floors.
DSWSH MC3 - SP&D 4
vii. Lift landing at each floor is an enclosed area provided with a
glass door.
8. A risk assessment has already been conducted and a security risk level of
Medium has been identified. Security mitigation measures should be based
on the following threats.
a. The following threats were identified for the risk assessment
conducted:
i. Internal Threats (Theft, Vandalism, Sabotage, Arson & Theft of
Confidential Information).
ii. External Threats (Intrusion, Theft, Vandalism, Sabotage, Arson,
Theft of Confidential Information & Vehicle Ramming).
9. The project requires the student to prepare the following:
Concept Plan proposing the security zoning and security measures (physical
& electronic) for the new 4 storey IT building, based on the protection in depth
& 5 Ds approach.
10. Consideration should be given to the operation of the facility when proposing
the security control measures. The control measures should not hinder the
daily operation of the facility